Dinesha Shetty is the project engineer for Godrej Florenne, as per the K-RERA filing. Shreyas M is the project architect, and both of them work out of Bengaluru. Bhavesh D Shah from Thane is the chartered accountant for the project. Together, these three experts sign off each stage of the Phase 1 build.

Below, you will find their licence numbers, the forms they signed and why their names matter to you. Each one plays a part in how your money moves into this Soukya Road rowhouse project.

Godrej Florenne Project Experts at a Glance

Role Name Licence / Registration No. Since Base Location
Project Engineer Dinesha Shetty BCCL/BL-3.6/SE-0177/24-25 2024 Vidyaranyapura, Bengaluru
Project Architect Shreyas M COA CA/2012/56957 2012 Bilekahalli, Bannerghatta Road, Bengaluru
Chartered Accountant Bhavesh D Shah ICAI Member ID 121603 2009 Panch Pakhadi, Thane
Project Contractor Not yet named NA on K-RERA NA NA

The architect signed Form 2 and the engineer signed Form 3 on 3 September 2026. The CA signed Form 1, which covers the cost figures for Phase 1.

What the Project Engineer Does at Godrej Florenne


The project engineer checks the structure of each building and signs Form 3 for K-RERA. This form confirms the estimated build cost and the actual work done on site.

At Godrej Florenne, Phase 1 covers nine rowhouse blocks and 150 homes. Each block rises four slab levels to a height of 13.35 metres. So the engineer must check foundations, RCC frames and plinth work across a wide site.

Dinesha Shetty holds a local authority licence with the code "SE" in its number. You can quote this number if you ever need to check his standing with the licensing body.

His role grows once the RCC frame work begins on site. K-RERA shows this stage running from December 2026 to February 2029.

What the Project Architect Does at Godrej Florenne


The architect designs the layout and signs Form 2 at each stage of the build. This form records how much of the work is complete, in percentage terms. K-RERA uses it to check that the build matches the approved plan.

Shreyas M holds Council of Architecture number CA/2012/56957, and you can check it on the COA website. His practice dates back to 2012, so he brings over a decade of registered work to the project.

His filing links to a set of plan details that you should know before you book.

Plan Detail Value on K-RERA
Approved plan number STRRPA/TP/CC/209/2026-27/1306
Plan approval date 28 August 2026
Sanctioned FAR 1.022
Total land area 80,987 sq m (about 20 acres)
Built-up area of all floors 50,592 sq m
Open area 50,165 sq m
Covered car parks 300

The low FAR explains why the project feels open and low-rise. Open space covers more than half the land, and you get G+3 rowhouses, not tall towers.

What the Chartered Accountant Adds


Bhavesh D Shah, a CA based in Thane, signed the Phase 1 cost figures in Form 1. His figures show a land cost of ₹118.98 crore and a development cost of ₹461.80 crore.

The CA also checks each withdrawal from the 70% escrow account. This keeps the cash flow in line with the work that the engineer and architect report.

Why These Three Names Matter to You as a Buyer


Under the RERA Act, 2016, Godrej cannot take money from escrow on its own word. The engineer, the architect and the CA must each certify the work and the spend first.

This gives you three separate checks between your payment and the builder's spending. If any form looks wrong, K-RERA can question it and ask for proof. Each expert also carries legal liability for every figure they sign.

For you, the benefit is simple, because your payments move with real progress and not with sales targets.

Who Will Build Godrej Florenne?


The K-RERA record lists the contractor as "NA" for now. That is common at launch, since large builders often pick a contractor after they get RERA approval.

Ask the sales team for the contractor name before you sign your agreement. A contractor with villa or rowhouse work in East Bengaluru adds weight to the 2030 handover date.

Key Construction Milestones Filed on K-RERA


The engineer and architect track progress against this schedule, so the main dates help you plan.

Stage Estimated Start Estimated Finish
Earthwork and levelling 15 Sep 2026 26 Aug 2028
Foundation and footing 15 Oct 2026 25 Sep 2028
RCC framed structure 14 Dec 2026 22 Feb 2029
Masonry 14 Mar 2027 23 May 2029
Painting 9 Dec 2027 3 Apr 2030
Gardens and external works 12 Jul 2027 30 Sep 2030

K-RERA shows 30 September 2030 as the Phase 1 completion date. Godrej quotes 8 October 2030 as the date you get possession of your home.

How to Check the Engineer and Architect Details


You can check both experts in a few minutes before you book a home.

  • Open rera.karnataka.gov.in and search for "GODREJ FLORENNE" or PR/150926/008942.
  • Scroll to "Associated Vendor Details" to see the engineer, architect and CA.
  • Check the architect's number on the Council of Architecture website.
  • Download Forms 1, 2 and 3 from the project page and read the signed figures.

Frequently Asked Questions


1. Who is the architect of Godrej Florenne?

Shreyas M is the project architect for Godrej Florenne, as per K-RERA. He holds COA number CA/2012/56957 and runs his practice from Bilekahalli in Bengaluru.

2. Who is the structural engineer for Godrej Florenne?

Dinesha Shetty is the project engineer named in the K-RERA filing. He holds licence BCCL/BL-3.6/SE-0177/24-25 and works from Vidyaranyapura in Bengaluru.

3. Who is the chartered accountant for Godrej Florenne?

Bhavesh D Shah, ICAI member 121603, is the chartered accountant for the project. He signed the Phase 1 cost figures and checks each escrow withdrawal as work moves ahead.

4. Who is the contractor for Godrej Florenne?

K-RERA shows the contractor as "NA" at this launch stage of the project. Ask the Godrej sales team for the contractor name before you sign your agreement.

5. What do Form 2 and Form 3 show?

The architect signs Form 2, which records the share of work done at each stage. The engineer signs Form 3, which confirms the build cost and the work done on site.

6. When will Godrej Florenne Phase 1 be ready?

K-RERA lists 30 September 2030 as the Phase 1 completion date for the project. Godrej quotes 8 October 2030 as the possession date for buyers.